
Contract and Claim manager under FIDIC contract conditions. Expert in Critical Path Method (CPM) and delay analysis.
Tel.: (+359) 878 364 179
Education:
- 1977 – 1982, Master Degree in Civil Engineering of the University of Architecture, Construction and Geodesy, Sofia
Postgraduate education:
- 2015, FIDIC International Federation of Consulting Engineers – Completed Certification Course: FIDIC – Advanced;
- 2012, ECV in partnership with FIDIC&CCM – Completed Course for Contracts Management under FIDIC, Vienna;
- Local computer networks in company management;
- Databases management software;
- Seismic protection of buildings and structures;
- Knowledge and application of civil engineering norm regulations according to Bulgarian and European legislation.
Languages:
- Fluent knowledge of ENGLISH;
- Fluent knowledge of RUSSIAN.
Skills:
- Long experience in using of expert systems for Project Management under FIDIC conditions.
- Familiar with project management methodology (PMBOK) and sustainable building certification systems (DGNB, LEED, BREEAM).
- Advanced user of Microsoft Office, Microsoft Project (since 1992), Gaudy, Building Manager and others software for cost estimating, business planning, project / contract controlling and financial reporting.
- Self-developed software for Project Management based on Microsoft ACCESS.
- More than ten years of experience in structural and complex designing, urban procedures, construction consulting and supervision.
Employment History (Company, Year(s), Position Projects):
GLAVBOLGARSTROY AD
2012 – now;
Current position: Director of Marketing & Bidding Department
Previous positions: Contract Manager/Chief Expert “Structural Funds and International Projects”
Responsibilities: Project Management, Time and Cost analyzing, Claim development, ongoing management and financial/technical control of Projects.
“Palace of Justice Compound – Prishtina, R.Kosovo”; Time & Cost Management and Control. Development of Claims and Variations. (Total amount of the project: 42 Mio Euros.);
BULGARCONSULT A&E LTD
2010 – 2012
Position: Chief Engineer
Responsibilities: Consulting, Designing and Project Management, management and direct participation in overall process of survey, urban planning, complex designing, coordination and reception of permissions, project management and financial/technical reports of projects.
– Network of international hypermarkets for toys and industrial goods «JUMBO» – building sites in Sofia (Vrabnitsa, Botevgradsko shosse), Burgas and Russe. (Total cost of the completed projects – 2010-2011г.: 27 Mio Euro.);
– Central office building of KNAUF-Bulgaria – Consulting and designing of building as sustainable (“green”) according to certified system DGNB. (Total cost of the completed works – 2010-2011г: 400 Thousand Euro.);
MCD GROUP VARNA Ltd.
2008-2010
Position: Main Consultant and Project Manager
Responsibilities: Management of urban procedures, design approval and erection of Black sea resort “Fish Fish“- Albena-Balchik, together with its own infrastructure (incl. external electric power connection to the Main city Trafo-station 110/20KV (with reconstruction of the station), electrical lines, on-site central Trafo-station and so on, water supply and water drain systems). Total area is about 230dka. (Total cost of the executed objects – 2008-2010: 4 Mio Euro.)
T TRUST ENGINEERING – Investment company, a part of the holding Balkantourist Development Services EAD
2003-2008
Position: Director
Responsibilities: Management of large investment projects in sea and mountain-ski tourism, including hotels, ski-lifts, systems for producing of artificial snow, infrastructural projects of power (incl. wind generator systems), water supply and water drain systems, treatment facilities for the water drain and sewage in the Borovets resort, “Paradise Beach” (St. Vlas resort) and others. (Total cost of the executed objects: 47 Mio Euro.)
During this period (2005-2006), as a consultant of MCD S.A.R.L /Holland/, participate in conducting of wind energy audit and feasibility study for a wind farm close to Oryahovo (Danube river), Bulgaria.
BOTANIC PROJECTS B.V. Investment company, a part of the holding MCD S.A.R.L /Holland/
2002-2003
Position: Head of «Botanic Projects B.V.» representative office in Moscow, Russia
Responsibilities: Investment, erection and management of multipurpose public and business (class A) buildings in the middle of Moscow: “Mokhovaya-business centre”, Business centre “Romanov Dvor”, American Medical Center – Moscow, etc. /total construction area 63 000 m2/ (Total project value (2001-2002) approximately 95 Mio USD );
BOTANIC PROJECTS B.V. /Holland/
2000-2002
Position: Project Manager
Responsibilities: Executing full analytical and marketing researches, providing business-plans, preparation of the tender documentation for realization of tenders, a choice of contractors, preparing technical and financial parts of agreements, preparing financial and time schedules, technical and financial management in process of construction, the current technical and financial reports, optimization of parameters, end of construction and putting the project into operation.
BULSTROY Ltd. (Russia, Moscow)
1999-2000
Position: Chief Executive Director
Responsibilities: Management and financial control of the following projects:
- Reconstruction of the hotel complex of Bulgarian embassy in Moscow;
- Reconstruction of the hotel complex «Alfa» /Moscow/;
- Reconstruction of the office building of «Prometey XXI» company in Moscow;
- Fit out in office building of «Daimler Kreisler» in Moscow /General Constructor- HOCHTIEF A.G., Germany/;
- Reconstruction of Bulgarian Technical Center in Moscow;
GLAVBOLGARSTROY AD
1994-1999
Position: Project Manager / Chief Expert in Marketing and Project management Department in the representation office in Moscow.
Responsibilities: Cooperation with the German company HOCHTIEF A.G. worked on preparation and joint sharing in competitions on building of following projects:
- Berliner House (German Cultural and Economical Center in Moscow) /apr. 18 000 m2/;
- Cargo terminal in airport Domodedovo;
- Reconstruction of «October-Kodak Multiplex» cinema in Moscow;
- Together with Procter & Gamble (USA) taking part in the preparation of the tender documentation, signing the contract, and fulfilled supervision of project of reconstruction of washing powder factory in Novomoscowsk, Moscow region;
During this period together with “Procter & Gamble» company (USA) taking part in the preparation of the tender documentation, signing the contract, and fulfilled supervision of project of reconstruction of washing powder factory in Novomoscowsk, Moscow region. Main contractor “Glavbolgarstroy” Inc.
Responsibilities: Management and financial control of the projects executed within the intergovernmental Russian-German construction program for housing of Russian militaries, coming back from Germany, namely:
- in Tula, Russia /project cost 51 Mio DM/ – Main contractor “Komplektstroy” Inc., Bulgaria;
- in Zernograd, Rostov region, Russia /project cost 53 Mio DM/ – Main contractor Larsen & Tubro Limited – India.
During this period, as the representative of Main contractors, worked in close co-operation with German consulting consortium CWU and with inspectorate of leading German banks, such as KfW/Frankfurt on Main/, Bayerishe Fereince Bank/Munich/. participation in preparing claims for increasing contract prices in total amount about 45 mln. DM
GLAVBOLGARSTROY AD
1993-1994
Position: Chief expert in “Planning and Cost control” department of the Main contractor – “Rosinterstroy”, Russia.
Responsibilities: Management and financial control of the investment project fulfillment – Kamenka, Penza Region, Russia, (project cost – 110 Mio DM) – within the intergovernmental Russian-German construction program for housing of Russian militaries, coming back from Germany.
GLAVBOLGARSTROY AD
1993
Position: Project Manager in Coordination Department
Responsibilities: Work on a project for the erection of the biggest in the Central Asia hospital complex as the representative of «Coordination» department in “GBS-Kazakhstan”./Kizil-Orda, Kazakhstan, project cost-110 Mio USD/
FUMI-Co Ltd.
1991-1993
Position: Chief of Engineering department – Designing and production of steel constructions.
KIPP ELECTROPROEKT, Sofia
1987-1991
Position: Head of the Computer Design Department.
Responsibilities: Working out and introduction of software products of complex designing and estimation of buildings.
KIPP ELECTROPROEKT, Sofia
1984-1987
Position: Head of the Construction Designing Group
Responsibilities: Designing and architectural supervision of following investment projects:
- Factory of the nuclear equipment – Pleven;
- Factory of Quasi-conductors – Botevgrad;
- Factory of radio-navigating equipment – Varna;
- Factory of printed-circuit boards – Pravets, etc.
KIPP ELECTROPROEKT, Sofia
1892-1984
Position: Construction Designer
