{"id":8365,"date":"2026-08-11T11:47:05","date_gmt":"2026-08-11T11:47:05","guid":{"rendered":"https:\/\/bscl.prototype.bg\/%d1%80%d0%be%d1%81%d0%b5%d0%bd-%d0%bc%d0%b8%d0%bb%d0%ba%d0%be%d0%b2\/"},"modified":"2026-08-13T09:37:03","modified_gmt":"2026-08-13T09:37:03","slug":"rossen-milkov","status":"publish","type":"page","link":"https:\/\/bscl.prototype.bg\/en\/rossen-milkov\/","title":{"rendered":"Rossen Milkov"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column width=&#8221;1\/6&#8243;][vc_single_image image=&#8221;8200&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221; css=&#8221;&#8221;][\/vc_column][vc_column width=&#8221;5\/6&#8243;][vc_column_text css=&#8221;&#8221;]Contract and Claim manager under FIDIC contract conditions. Expert in Critical Path Method (CPM) and delay analysis.<\/p>\n<p><i class=\"fa fa-envelope-o\"><\/i>\u00a0<a href=\"mailto:rmilkov@gbs-bg.com\">rmilkov@gbs-bg.com<\/a><\/p>\n<p>Tel.: (+359) 878\u00a0364 179<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Education:<\/strong><\/p>\n<ul>\n<li>1977 \u2013 1982, Master Degree in Civil Engineering of the University of Architecture, Construction and Geodesy, Sofia<\/li>\n<\/ul>\n<p><strong>Postgraduate education:<\/strong><\/p>\n<ul>\n<li>2015, FIDIC International Federation of Consulting Engineers \u2013 Completed Certification Course: FIDIC \u2013 Advanced;<\/li>\n<li>2012, ECV in partnership with FIDIC&amp;CCM \u2013 Completed Course for Contracts Management under FIDIC, Vienna;<\/li>\n<li>Local computer networks in company management;<\/li>\n<li>Databases management software;<\/li>\n<li>Seismic protection of buildings and structures;<\/li>\n<li>Knowledge and application of civil engineering norm regulations according to Bulgarian and European legislation.<\/li>\n<\/ul>\n<p><strong>Languages:<\/strong><\/p>\n<ul>\n<li>Fluent knowledge of ENGLISH;<\/li>\n<li>Fluent knowledge of RUSSIAN.<\/li>\n<\/ul>\n<p><strong>Skills:<\/strong><\/p>\n<ul>\n<li>Long experience in using of expert systems for Project Management under FIDIC conditions.<\/li>\n<li>Familiar with project management methodology (PMBOK) and sustainable building certification systems (DGNB, LEED, BREEAM).<\/li>\n<li>Advanced user of Microsoft Office, Microsoft Project (since 1992), Gaudy, Building Manager and others software for cost estimating, business planning, project \/ contract controlling and financial reporting.<\/li>\n<li>Self-developed software for Project Management based on Microsoft ACCESS.<\/li>\n<li>More than ten years of experience in structural and complex designing, urban procedures, construction consulting and supervision.<\/li>\n<\/ul>\n<p><strong>Employment History (Company, Year(s), Position Projects):<\/strong><\/p>\n<p><strong><u>GLAVBOLGARSTROY AD<br \/>\n<\/u><\/strong>2012 \u2013 now;<br \/>\n<u>Current position:\u00a0<\/u>Director of Marketing &amp; Bidding Department<br \/>\n<u>Previous positions:<\/u>\u00a0Contract Manager\/Chief Expert \u201cStructural Funds and International Projects\u201d<br \/>\n<em>Responsibilities:\u00a0<\/em>Project Management, Time and Cost analyzing, Claim development, ongoing management and financial\/technical control of Projects.<br \/>\n\u201cPalace of Justice Compound \u2013 Prishtina, R.Kosovo\u201d; Time &amp; Cost Management and Control. Development of Claims and Variations. (Total amount of the project: 42 Mio Euros.);<\/p>\n<p><strong><u>BULGARCONSULT A&amp;E LTD<br \/>\n<\/u><\/strong>2010 \u2013 2012<br \/>\n<u>Position<\/u>: Chief Engineer<br \/>\n<em>Responsibilities:<\/em>\u00a0Consulting, Designing and Project Management, management and direct participation in overall process of survey, urban planning, complex designing, coordination and reception of permissions, project management and financial\/technical reports of projects.<br \/>\n\u2013 Network of international hypermarkets for toys and industrial goods \u00abJUMBO\u00bb \u2013 building sites in Sofia (Vrabnitsa, Botevgradsko shosse), Burgas and Russe. (Total cost of the completed projects \u2013 2010-2011\u0433.: 27 Mio Euro.);<br \/>\n\u2013 Central office building of KNAUF-Bulgaria \u2013 Consulting and designing of building as sustainable (\u201cgreen\u201d) according to certified system DGNB. (Total cost of the completed works \u2013 2010-2011\u0433: 400 Thousand Euro.);<\/p>\n<p><strong><u>MCD GROUP VARNA Ltd.<br \/>\n<\/u><\/strong>2008-2010<br \/>\n<u>Position<\/u>: Main Consultant and Project Manager<br \/>\n<em>Responsibilities:<\/em>\u00a0Management of urban procedures, design approval and erection of Black sea resort \u201cFish Fish\u201c- Albena-Balchik, together with its own infrastructure (incl. external electric power connection to the Main city Trafo-station 110\/20KV (with reconstruction of the station), electrical lines, on-site central Trafo-station and so on, water supply and water drain systems). Total area is about 230dka. (Total cost of the executed objects \u2013 2008-2010: 4 Mio Euro.)<\/p>\n<p><strong><u>T TRUST ENGINEERING<\/u><\/strong><strong>\u00a0\u2013 Investment company, a part of the holding Balkantourist Development Services EAD<br \/>\n<\/strong>2003-2008<br \/>\n<u>Position<\/u>: Director<br \/>\n<em>Responsibilities:<\/em>\u00a0Management of large investment projects in sea and mountain-ski tourism, including hotels, ski-lifts, systems for producing of artificial snow, infrastructural projects of power (incl. wind generator systems), water supply and water drain systems, treatment facilities for the water drain and sewage in the Borovets resort, \u201cParadise Beach\u201d (St. Vlas resort) and others. (Total cost of the executed objects: 47 Mio Euro.)<\/p>\n<p>During this period (2005-2006), as a consultant of MCD S.A.R.L \/Holland\/, participate in conducting of wind energy audit and feasibility study for a wind farm close to Oryahovo (Danube river), Bulgaria.<\/p>\n<p><strong><u>BOTANIC PROJECTS B.V.<\/u><\/strong><strong>\u00a0Investment company, a part of the holding MCD S.A.R.L \/Holland\/<br \/>\n<\/strong>2002-2003<br \/>\n<u>Position<\/u>: Head of \u00abBotanic Projects B.V.\u00bb representative office in Moscow, Russia<br \/>\n<em>Responsibilities:<\/em>\u00a0Investment, erection and management of multipurpose public and business (class A) buildings in the middle of Moscow: \u201cMokhovaya-business centre\u201d, Business centre \u201cRomanov Dvor\u201d, American Medical Center \u2013 Moscow, etc. \/total construction area 63 000 m2\/ (Total project value (2001-2002) approximately 95 Mio USD );<\/p>\n<p><strong><u>BOTANIC PROJECTS B.V.<\/u><\/strong><strong>\u00a0\/Holland\/<br \/>\n<\/strong>2000-2002<br \/>\n<u>Position<\/u>: Project Manager<br \/>\n<em>Responsibilities:<\/em>\u00a0Executing full analytical and marketing researches, providing business-plans, preparation of the tender documentation for realization of tenders, a choice of contractors, preparing technical and financial parts of agreements, preparing financial and time schedules, technical and financial management in process of construction, the current technical and financial reports, optimization of parameters, end of construction and putting the project into operation.<\/p>\n<p><strong><u>BULSTROY Ltd.<\/u><\/strong><strong>\u00a0(Russia, Moscow)<br \/>\n<\/strong>1999-2000<br \/>\n<u>Position<\/u>: Chief Executive Director<br \/>\n<em>Responsibilities:<\/em>\u00a0Management and financial control of the following projects:<\/p>\n<ul>\n<li>Reconstruction of the hotel complex of Bulgarian embassy in Moscow;<\/li>\n<li>Reconstruction of the hotel complex \u00abAlfa\u00bb \/Moscow\/;<\/li>\n<li>Reconstruction of the office building of \u00abPrometey XXI\u00bb company in Moscow;<\/li>\n<li>Fit out in office building of \u00abDaimler Kreisler\u00bb in Moscow \/General Constructor- HOCHTIEF A.G., Germany\/;<\/li>\n<li>Reconstruction of Bulgarian Technical Center in Moscow;<\/li>\n<\/ul>\n<p><strong><u>GLAVBOLGARSTROY AD<br \/>\n<\/u><\/strong>1994-1999<br \/>\n<u>Position<\/u>: Project Manager \/ Chief Expert in Marketing and Project management Department in the representation office in Moscow.<br \/>\n<em>Responsibilities:\u00a0<\/em>Cooperation with the German company HOCHTIEF A.G. worked on preparation and joint sharing in competitions on building of following projects:<\/p>\n<ul>\n<li>Berliner House (German Cultural and Economical Center in Moscow) \/apr. 18 000 m2\/;<\/li>\n<li>Cargo terminal in airport Domodedovo;<\/li>\n<li>Reconstruction of \u00abOctober-Kodak Multiplex\u00bb cinema in Moscow;<\/li>\n<li>Together with Procter &amp; Gamble (USA) taking part in the preparation of the tender documentation, signing the contract, and fulfilled supervision of project of reconstruction of washing powder factory in Novomoscowsk, Moscow region;<\/li>\n<\/ul>\n<p>During this period together with \u201cProcter &amp; Gamble\u00bb company (USA) taking part in the preparation of the tender documentation, signing the contract, and fulfilled supervision of project of reconstruction of washing powder factory in Novomoscowsk, Moscow region. Main contractor \u201cGlavbolgarstroy\u201d Inc.<\/p>\n<p><em>Responsibilities:\u00a0<\/em>Management and financial control of the projects executed within the intergovernmental Russian-German construction program for housing of Russian militaries, coming back from Germany, namely:<\/p>\n<ul>\n<li>in Tula, Russia \/project cost 51 Mio DM\/ \u2013 Main contractor \u201cKomplektstroy\u201d Inc., Bulgaria;<\/li>\n<li>in Zernograd, Rostov region, Russia \/project cost 53 Mio DM\/ \u2013 Main contractor Larsen &amp; Tubro Limited \u2013 India.<\/li>\n<\/ul>\n<p>During this period, as the representative of Main contractors, worked in close co-operation with German consulting consortium CWU and with inspectorate of leading German banks, such as KfW\/Frankfurt on Main\/, Bayerishe Fereince Bank\/Munich\/. participation in preparing claims for increasing contract prices in total amount about 45 mln. DM<\/p>\n<p><strong><u>GLAVBOLGARSTROY AD<br \/>\n<\/u><\/strong>1993-1994<br \/>\n<u>Position<\/u>: Chief expert in \u201cPlanning and Cost control\u201d department of the Main contractor \u2013 \u201cRosinterstroy\u201d, Russia.<br \/>\n<em>Responsibilities:<\/em>\u00a0Management and financial control of the investment project fulfillment \u2013 Kamenka, Penza Region, Russia, (project cost \u2013 110 Mio DM) \u2013 within the intergovernmental Russian-German construction program for housing of Russian militaries, coming back from Germany.<\/p>\n<p><strong><u>GLAVBOLGARSTROY AD<br \/>\n<\/u><\/strong>1993<br \/>\n<u>Position<\/u>: Project Manager in Coordination Department<br \/>\n<em>Responsibilities:\u00a0<\/em>Work on a project for the erection of the biggest in the Central Asia hospital complex as the representative of \u00abCoordination\u00bb department in \u201cGBS-Kazakhstan\u201d.\/Kizil-Orda, Kazakhstan, project cost-110 Mio USD\/<\/p>\n<p><strong><u>FUMI-Co Ltd.<br \/>\n<\/u><\/strong>1991-1993<br \/>\n<u>Position<\/u>: Chief of Engineering department \u2013 Designing and production of steel constructions.<\/p>\n<p><strong><u>KIPP ELECTROPROEKT<\/u><\/strong><strong>,\u00a0 Sofia<br \/>\n<\/strong>1987-1991<br \/>\n<u>Position<\/u>: Head of the Computer Design Department.<br \/>\n<em>Responsibilities:\u00a0<\/em>Working out and introduction of software products of complex designing and estimation of buildings.<\/p>\n<p><strong><u>KIPP ELECTROPROEKT<\/u><\/strong><strong>, Sofia<br \/>\n<\/strong>1984-1987<br \/>\n<u>Position<\/u>: Head of the Construction Designing Group<br \/>\n<em>Responsibilities:<\/em>\u00a0Designing and architectural supervision of following investment projects:<\/p>\n<ul>\n<li>Factory of the nuclear equipment \u2013 Pleven;<\/li>\n<li>Factory of Quasi-conductors \u2013 Botevgrad;<\/li>\n<li>Factory of radio-navigating equipment \u2013 Varna;<\/li>\n<li>Factory of printed-circuit boards \u2013 Pravets, etc.<\/li>\n<\/ul>\n<p><strong><u>KIPP ELECTROPROEKT<\/u><\/strong><strong>, Sofia<br \/>\n<\/strong>1892-1984<br \/>\n<u>Position<\/u>: Construction Designer[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column width=&#8221;1\/6&#8243;][vc_single_image image=&#8221;8200&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221; css=&#8221;&#8221;][\/vc_column][vc_column width=&#8221;5\/6&#8243;][vc_column_text css=&#8221;&#8221;]Contract and Claim manager under FIDIC contract conditions. Expert in Critical Path Method&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-8365","page","type-page","status-publish"],"_links":{"self":[{"href":"https:\/\/bscl.prototype.bg\/en\/wp-json\/wp\/v2\/pages\/8365","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bscl.prototype.bg\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/bscl.prototype.bg\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/bscl.prototype.bg\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bscl.prototype.bg\/en\/wp-json\/wp\/v2\/comments?post=8365"}],"version-history":[{"count":2,"href":"https:\/\/bscl.prototype.bg\/en\/wp-json\/wp\/v2\/pages\/8365\/revisions"}],"predecessor-version":[{"id":8381,"href":"https:\/\/bscl.prototype.bg\/en\/wp-json\/wp\/v2\/pages\/8365\/revisions\/8381"}],"wp:attachment":[{"href":"https:\/\/bscl.prototype.bg\/en\/wp-json\/wp\/v2\/media?parent=8365"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}